 |
 |
 |
 |
 |
 |
 |
 |
|
Education
|
|
|
|
A selection of our projects in the education sector.
|
|
|
|
 |
|
|
|
|
 |
 |
|
Moulton College Social Centre, Northamptonshire
Construction of a three storey Social Centre building with Lift installation associated mechanical and electrical services including specialist fit out commercial kitchen facilities and bar areas.
£3.80 million
|
|
|
|
|
|
 |
|
|
|
|
 |
 |
|
Moulton College Countryside Management Centre, Northamptonshire
Construction of a Management Centre comprising of Steel Frame on PAD foundation, Masonry and Composite Cladding and Roofing, Sustainable Drainage incorporating Soakaways and Biodisc. Stored Gas Servicing boiler which is implemented by solar collectors.
£0.62 million
|
|
|
|
|
|
 |
|
|
|
|
 |
 |
|
St Brendans School, Corby
Minor Refurbishment of a Catholic Primary School built in the 1960’s with the addition of large classroom extensions, curved roof’s and glulam timber beams.
£1.86 million
|
|
|
|
|
|
 |
|
|
|
|
 |
 |
|
Leagrave School, Luton
Refurbishment and alterations to two existing school blocks including asbestos strip out works, new lighting and electrical installation complete with new heating system to improve thermal efficiency.
£0.60million
|
|
|
|
|
|
 |
|
|
|
|
 |
 |
|
Remodelling & Extensions at St Margaret of Scotland School, Luton
New classroom block, extensions, alterations and refurbishment of existing school buildings
£1.20 million
|
|
|
|
|
|
 |
|
|
|
|
 |
 |
|
Akeley Wood School, Charmandean
The Project comprises internal remodelling and refurbishment (area approximately 450 m2) to form specialist classrooms, staffroom, administration offices and upgraded cloaks and toilet facilities, together with all engineering services, drainage and builder’s work trenches.
£0.40 million
|
|
|
|
|
|
 |
|
|
|
|
 |
 |
|
Beauchamp College, Oadby
Extensive extensions and alterations to provide ADT facilities to existing Design Block at Beauchamp College, Oadby, phased into Sections. Works generally involved relocation of existing equipment and new fixed furniture and fittings.
£2.30 million
|
|
|
|
|
|
 |
|
|
|
|
 |
 |
|
School of Engineering, Cranfield University
Three storey office block featuring traditional steel and cladded envelope and roof with aluminium windows, precast concrete floors, and block partitions.
£2.80 million
|
|
|
|
|
|
 |
|
|
|
|
 |
 |
|
Oxford Brookes University
New three storey research building for Oxford Brookes University, SRIF I & II works. The project has a gently curved roof and an external steel framework.
£4.50 million
|
|
|
|
|
|
 |
|
|
|
|
 |
 |
|
Laxton School, Oundle
New 2 storey Private Junior School, Laxton School, Oundle, Northants for Oundle School Building Company
£3.40 million
|
|
|
|
|
|
 |
|
|
|
|
 |
 |
|
St. Matthews Infant & Junior Schools, Luton
Amalgamation of St. Matthews Infant & Junior Schools, Luton, comprising 4 single storey extensions to existing building and alteration and refurbishment of existing classrooms within the occupied schools.
£0.80 million
|
|
|
|
|
|
 |
|
|
|
|
 |
 |
|
Phases I & II Lodge Park Technology College, Corby
Phase I – construction of a new 3 storey 6th Form block in its place, situated between two existing school blocks.
Phase II – construction of a new 3 storey Integrated Learning Centre linked at one side to the existing building.
£2.60 million
|
|
|
|
|
|
 |
|
|
|
|
 |
 |
|
New Innovations Centre for University of Northampton.
Extensive refurbishment and remodelling of an existing teaching facility within a live university campus. The new facility provides state of the art student innovation resources.
£0.70 million
|
|
|
|
|
|
 |